This page is designed to help residents track projects taking place across the community.

Project Information

Community Project Tracking

The Community Projects section includes routine and planned improvements that typically occur during the summer months and move forward as part of normal operations, regardless of any special assessment. The Club Projects section tracks club projects funded by the clubs.

The Assessment Projects section tracks projects specifically funded by the approved special assessment. These are separate, designated improvements tied directly to that funding and are presented independently for clarity and transparency.

Jump ahead to a particular project group:

COMMUNITY PROJECTS

2026 Summer Projects at Roadhaven Resort

Access Exterior Interior Structural
Access

DAKOTA ROOM

Completed

Project Outline

Back door jamb repairs are being completed in the Dakota Room to address wear and restore proper function. This work will improve door alignment and ensure a secure, reliable entry point.

Details

Project Status:
Completed
Interior

GREEN ROOM

Completed

Project Outline

Work is pending in the Green Room to remove the existing tint and apply new tint to the sliding glass doors. This update will improve appearance while enhancing light control and overall comfort within the space.

Details

Project Status:
Completed
Exterior

PERIMETER WALL

In Progress

Project Outline

Exterior painting of the perimeter wall along Buena Vista and 16th Ave is scheduled as an upcoming project to refresh the appearance of the property. This work will improve overall curb appeal and help protect the wall from weathering once completed.

Details

Project Status:
In Progress
Exterior

CURB WORK

Completed

Project Outline

Curb work to touch up yellow caution striping throughout the resort is scheduled as an upcoming project. This will improve visibility and reinforce safety across high-traffic areas once completed.

Details

Project Status:
Completed
Interior

PHASE I SHOWERS

Completed

Project Outline

Grout work in the Phase I men’s and women’s showers is scheduled as an upcoming project to address wear and maintain proper sealing. This will improve durability, cleanliness, and overall appearance once completed.

Details

Project Status:
Completed
Interior

REC HALL

Completed

Project Outline

Work will include professional cleaning and fire-retardant treatment of the stage curtains, cleaning of Rec Hall chairs, and reconstruction of the cabinets located beneath the pass-through window in the Rec Hall kitchen area. These improvements are intended to help maintain the facility, extend the life of existing assets, and improve the overall experience for residents and guests.

Details

Project Status:
Completed
Structural

BIP RESTROOM ROOF

Completed

Project Outline

Roof repairs at the BIP restroom, including the installation of new shingles, are scheduled as an upcoming project. This work will address existing wear and help protect the structure from future weather-related damage.

Details

Project Status:
Completed
Structural

MEDICAL SHED

Completed

Project Outline

Rebuilding the doorway at the Medical Shed is scheduled as an upcoming project to address structural wear and ensure proper access. This work will improve durability and provide a more secure, functional entry once completed.

Details

Project Status:
Completed

CLUB PROJECTS

The projects below are funded by the individual clubs

Art Lapidary Shuffleboard
Art

ART CLUB

Completed

Project Outline

Install preordered cabinets and countertops in the Art Room and electrical work has been completed.

Details

Project Status:
Completed
Lapidary

LAPIDARY

Completed

Project Outline

Drain cleaning and new valve installation in the Lapidary area are scheduled as an upcoming project to improve water flow and overall system function. This work will help prevent backups and support consistent operation once completed.

Details

Project Status:
Completed
Shuffleboard

SHUFFLEBOARD

Completed

Project Outline

Concrete painting and drain cleaning in the Shuffleboard area are scheduled as an upcoming project to refresh the space and address drainage concerns. This work will improve overall appearance and help maintain proper water flow once completed.

Details

Project Status:
Completed

Special Assessment PROJECTS

The projects below cover year 1 of the 3 year special assessments projects plan

Facilities Golf Infrastructure Pool Technology Water
Facilities

BLOCK WALL

Completed

Project Outline

Professional evaluations are needed to identify cracks, shifting, rust, and stability issues to prevent structural failures and costly emergencies.

Details

Project Status:
Completed
Facilities

Gas Packs & HVAC

Completed

Project Outline

Multiple heat pumps, gas packs, and mini-splits. These aging systems are less e ffi cient and prone to failure. A ging systems are less e ffi cient and increasingly prone to sudden failure; Proactive replacement helps control expenses and maintain reliability.

Details

Project Status:
Completed
Golf

EQUIPMENT

Completed | Mower Pending

Project Outline

Several critical pieces of equipment are currently being replaced or upgraded as part of an active project:

  • The aerator is being replaced due to failure and lack of available parts.
  • The greens mower is being repaired or replaced to address hydraulic issues.

Details

Project Status:
Completed | Mower Pending
Infrastructure

CULVERTS

Completed

Project Outline

Culverts beneath this section of roadway will be replaced due to severe deterioration. Rusted-through sections have exposed underlying soil and weakened the street above, while trapped water has accelerated corrosion and increased the risk of flooding and sinkholes. This replacement work is underway to prevent roadway failure, protect public safety, and avoid costly emergency repairs.

Details

Project Status:
Completed
Infrastructure

STREET RESEAL

Completed

Project Outline

Streets should be resealed every 5–7 years to prevent cracking, water intrusion, and major structural failures, protecting long-term roadway investment.

Details

Project Status:
Completed
Pool

RESURFACING

Completed

Project Outline

Phase II Pool, spa, and deck surfaces are failing, with cracks and material loss despite repeated patching. The deck’s rubberized surface is trapping moisture in areas, causing bubbling, staining, and ongoing deterioration. Full resurfacing and deck rehabilitation are needed.

Details

Project Status:
Completed
Pool

SALT CELL SYSTEM

Completed

Project Outline

Current salt cells at the Phase II pool are undersized and stacked to meet demand, stressing equipment and reducing performance. A commercial-grade system is required for proper sanitation and reliability.

Details

Project Status:
Completed
Pool

SAND FILTER

Completed

Project Outline

Five of the six fi lters for Phase I & Phase II pools and spas have exceeded their useful life, reducing fi ltration effectiveness and water quality while increasing the risk of equipment failure. Replacing them will improve system performance, enhance water quality, and improve overall skimmer effectiveness.

Details

Project Status:
Completed
Technology

CAMERA SYSTEMS

Completed

Project Outline

Over the past decade, more than 140 cameras have been installed throughout the resort. Because they were added gradually over many years, the system now includes a mix of equipment—ranging from older analog cameras to newer digital models. This staggered approach has created inconsistencies in technology, cabling, and platforms.

We will be transitioning to a single, standardized platform and connection type will greatly improve system reliability, streamline repairs, and enhance overall security coverage for the community.

Details

Project Status:
Completed
Technology

NETWORK SWITCHES

Completed

Project Outline

Network switches across the resort are actively being replaced and standardized to improve reliability and security. These switches serve as the critical connection point between the fiber optic network and essential systems, including computers, WiFi, security cameras, gate operations, and VOIP phones.

Most of the existing switches have reached end of life and no longer receive security updates, increasing the risk of failure and cyber incidents. In addition, the system was built over time without a consistent design, making troubleshooting and management difficult. This project addresses those issues by upgrading and standardizing the network infrastructure.

Details

Project Status:
Completed
Water

FIRE HYDRANTS

Completed

Project Outline

Three fire hydrants will be replaced.

Details

Project Status:
Completed
Water

WATER VALVES

Completed

Project Outline

Isolation valves regulate water flow, allowing repairs to be completed without shutting down service to large sections. The system includes over 100 valves, with recent inspections identifying 20 that have failed or are in declining condition.

Details

Project Status:
Completed

Other Roadhaven Projects happening this Summer

Completed

Golf Course Drainage Path – Near hole 7, the added concrete helps water flow across the cart path without rutting out the dirt.

Status: Completed.
Completed

Golf Maintenance – Curbing on the course near hole 6.

Status: Completed
Completed

Lift Station – The junction box for the transformer was replaced in the lift station.

Status: Completed
Completed

Rec Hall South Wall – Prep and Painting of South Wall

Status: Completed

Deferred Maintenance: Background and Path Forward

As we began developing the upcoming summer projects list, we reviewed the Association’s Reserve Studies from 2017 and 2023 to better understand which major repairs and replacements had been completed and which were coming due. That review quickly revealed a larger issue.

Many items identified in prior years had been deferred, temporarily repaired, or replaced with equipment already near the end of its useful life. What initially appeared to be isolated maintenance needs was, in reality, a growing backlog without a long-term strategy to fully address it.

It also became clear that the long-standing approach of minimizing quarterly assessment increases limited the Association’s ability to keep pace with aging infrastructure and adequately fund reserves.

In response, the community approved a Special Assessment to move forward with a comprehensive plan to address these needs. The projects will be carried out over a three-year period, with the majority of work taking place in Years 1 and 2, and the lake liner project scheduled for Year 3.

Together, these efforts represent a more structured and proactive approach to addressing deferred maintenance. The goal is to improve infrastructure reliability, protect public safety, and strengthen the Association’s long-term financial stability and property values.

Projects By Year:

(Project timelines may change.)

Year 1

Year 1 (2026-2027)

Equipment and Machinery
  • Boom Lift
Facilities
  • Block Wall Assessment
  • Heat Pumps, Gas Packs, Mini Splits
Golf Course Equipment
  • Aerator
  • Greens Mower
Infrastructure and Streets
  • Culvert Repairs
  • Reseal Streets
Pools and Aquatics
  • Phase I and Phase II Sand Filters
  • Salt Cell System Phase II
Technology and Security
  • Cameras and Cabling
  • Network Switches
Water System
  • Fire Hydrant Replacement
  • Isolation Valves

Year 2

Year 2 (2027-2028)

Equipment
  • Rec Hall Ice Machine and Condenser
  • Restaurant Equipment
Facilities
  • Common Area Flooring – Carpet/Vinyl
  • Exterior Paint Common Area Buildings
  • Interior Paint
  • Windows and Screens
Golf
  • Chemical Spray Tank for Golf Course
  • Golf Course Irrigation Timers
  • Seed Spreader
  • Tee Box Screen Replacement
  • Used Golf Carts
Infrastructure
  • Bridge Structural Evaluations
  • Concrete Repairs – Common Areas/Canal
Pools
  • Phase I Aquatic Building Moisture Barrier
  • Phase II Deck
  • Phase II Pool/Spa Resurface
Water
  • Water Fountain Replacements

Year 3

Year 3 (2028-2029)

#8 Lake Liner/Asphalt/Concrete
Deferred Maintenance View, Download, or Print the full Deferred Maintenance Overview Packet
View Packet